21 January 2011
62 Buckingham Gate, London SW1



Noise and vibration were kept to an absolute minimum using the Kowan WP150 Still Workers when piling on the site directly adjacent to the Westminster Council Offices on Victoria Street, London and the Korean Embassy on Spenser Street, London. The sheet piles were installed through the sands and gravels to toe into the clay strata approximately 13m below ground level.
Search This Blog
Piling Labels
AE Yates Ltd
(1)
Appleton Piling Ltd
(1)
Crane
(1)
Kowan WP150
(2)
Logicrane
(1)
project profile
(3)
rigging
(1)
SPI Appleton Ltd
(1)
Steel Pile Installations Ltd
(1)
telescopic leader rig
(1)
website
(1)
Videos of our Piling Operations
Partners & Affiliates